Field Verification
Ten thousand valves holding 300 PSI under pressure
10,000+
Installed valves
100%
Hydro test pass rate
24 hr
Rush dispatch
Lead Contractor Report
We dropped the OS&Y valves and grooved fittings into a twenty-story high-rise and passed the inspector's initial hydro-test on the very first run without a single weep.
Marcus Vance, Senior Mechanical Superintendent
Project Performance
Reliability on high-stakes builds
Getting certified cut sheets and UL-listed specs for the submittal package took five minutes instead of three days.
Dana K., Project Engineer
The red epoxy coating on the ductile iron fittings holds up against jobsite mud and rough handling.
Tom R., Fire Protection Lead
Same-day dispatch on replacement pump controllers saved our commissioning schedule from a two-week delay.
S. Alvarez, Facilities Director
Open your commercial trade account
Access net-30 project credit, certified submittal packages, and dedicated dispatch support.
